Since February 2013 we at HSC Worcester have been assisting BT Openreach with the “BT Pole Safe” Project.Designated decayed and damaged poles are selected by the Openreach “Pole Safe” Team to be tested before our Engineers remove the wires and plant.Once we have removed the wires and plant the poles are again tested and the results are recorded and returned along with the pole to Herriot Watt University where further tests are conducted on the pole itself.
Project summary
- Decayed and Damaged poles selected from across the BT Network .
- Pole Tested with and without wires and plant.
- Pole marked and returned to Depot for collection.
- Pole collected and delivered to Herriot Watt University for further examination.
- New pole installed.
Like to work with us?
Call us on 01905 641088
or enquire online to see how we can help.
Mobile Comms – Less paper,more control.
At HSC Worcester Ltd we are proud to announce that on Monday 12th August we went live with our CT led Mobile Comms App which collectively embraces modern technology to give greater control to our depots while reducing paper volumes and costly printing costs. This...